Project news
March, 2011
1. The General layout is developed and sent on the coordination.
2. Are received THAT on water supply, the water drain, a heat supply and water removal.
February, 2011
1. The Town-planning plan is received.
2. Demands for specifications of connection of object to networks of technical maintenance (water supply, water removal, the water drain, a heat supply, an electrical supply) are issued.
January, 2011
"The project of the organization of building", the developer of "Strojgenplan" is developed.
Sections are included in the project:
* the general plan
* architectural decisions
* ferro-concrete designs
* an accomplishment
* heating, ventilation